Waste Incinerators

HICLOVER|Medical |Environmental|Pet Animal
Menu
  • Home
  • About Us
  • Products
    • FAQs
  • Hot Sale
  • Project Case
  • Blog
    • Incinerator Video
  • Contact Us
    • Eblogs
    • 中文网站
  • Login Customizer
  • small capacity incinerators

    small capacity incinerators

  • 1 No. in Primary Chamber and 1No. in Secondary Chamber

  • Opponents of Covanta rail development want more time for public comment

    Opponents of Covanta rail development want more time for public comment

  • installation of waste disposable incinerator system

  • Medical Incinerator 30 kg/hr Burn Capacity minimum

  • PYROLYTIC incinerator

  • Incinérateurs

    Incinérateurs

  • Prepping for Ebola in Pennsylvania involves orchestra of departments

    Prepping for Ebola in Pennsylvania involves orchestra of departments

  • CONTAINERIZED INCINERATOR FOR INCINERATING HAZARDOUS AND NON HAZARDOUS WASTES

    CONTAINERIZED INCINERATOR FOR INCINERATING HAZARDOUS AND NON HAZARDOUS WASTES

  • Mobile Incinerator Burn Rate 50kg/h minimum

  • Incinerator for hospital waste management

    Incinerator for hospital waste management

  • Waste incineration industry momentum is fierce level of related facilities to be improved

    Waste incineration industry momentum is fierce level of related facilities to be improved

  • Sources of Healthcare Waste

  • Containerised Biohazard Incinerator

  • crematorium manufacturers

  • One chamber incinerator

1 No. in Primary Chamber and 1No. in Secondary Chamber

No. of burners: 2 Nos. (1 No. in Primary Chamber and 1No. in Secondary Chamber)Type: Monoblock fully automaticFuel: DieselFuel Oil Storage Tank:Shall provide suitable capacity of oil storage tank.Material of Construction: Mild steel.Facility for visual checking of fuel shall be there.It shall have diesel consumption monitoring system.It shall come with diesel oil level indicator, piping with valves & N.R. valve.Control Panel:Type: Manual & Automated PLC based control panel with printer & recording device.Material of Construction: CRCA sheetIt shall have digital temperature controller.Epoxy powder coated washable paint finish.It shall have audio-visual alarm system.Chimney of 30 meters Height:Material of Construction: Mild SteelIt shall be self-supporting type.Height shall be 30 meters from ground level.Paint The chimney is painted externally with two coats of heat resistant aluminum paintShall provide ladder till the top.It shall have 3mm thick rubber lining from inside for protection.It shall come with aviation lamp, lightening arrestor, stack, drain, inspection platform, samplingport.Consumption certificate:The bidder must submit diesel consumption for a daily operation of 6 hours.Turnkey:Prices offered shall be inclusive of all civil works, electrical requirements including cabling andswitches required for installation & commissioning of the equipment.Bidder shall submit detail drawings, design, and layout plan of civil works.The bidder shall submit the details of BOQ of civil and electrical works.Accessories, spares and consumablesAll standard accessories, consumables and parts required to operate the equipment, includingall standard tools and cleaning and lubrication materials, to be included in the offer. Biddersmust specify the quantity of every item included in their offer (including items not specifiedabove).Operating EnvironmentThe system offered shall be designed to store and to operate normally under the conditions ofthe purchaser’s country. The conditions include Power Supply, Climate, Temperature,Humidity, etc.Power supply: 220-240 VAC, 50Hz single phase/400 C 420 VAC, 50Hz three phase asappropriate fitted with appropriate plug. The power cable must be at least 3 meter in length.Standards and Safety RequirementsIt shall have approval of “Pollution Control Board” of purchaser’s country.All mandatory approvals required for the installation and operation of incinerator shall be doneby the bidder.Must submit ISO 9001 ANDCE or USFDA approved product certificate.User TrainingMust provide user training (including how to use and maintain the equipment).WarrantyComprehensive warranty for 2 years after acceptance.Maintenance Service during Warranty PeriodDuring the warranty period supplier must ensure preventive maintenance along withcorrective/breakdown maintenance whenever required.Installation and CommissioningThe bidder must arrange for the equipment to be installed and commissioned by certified orqualified personnel; any prerequisites for installation to be communicated to the purchaser inadvance, in detail.

Medical Incinerator 30 kg/hr Burn Capacity minimum

PYROLYTIC incinerator

Mobile Incinerator Burn Rate 50kg/h minimum

Blog

small capacity incinerators

small capacity incinerators

1    Basic Plant Design    An approved plant must have four distinct sections that demonstrate three principles of Turbulence, Residence Time and …
Opponents of Covanta rail development want more time for public comment

Opponents of Covanta rail development want more time for public comment

Residents have less than a week left to file formal comments with a state agency overseeing plans for a controversial rail …

installation of waste disposable incinerator system

installation of waste disposable system in airport.Incinerator with oil burner Capacity  2 ton/day, Oil tank 300 l  Oil pump 0.4Kw , …
Incinérateurs

Incinérateurs

Carburant Diesel Capacité (M3) 1.92 Ave Capacity 1200kg Consommation (litre/heure 12 Dimension externes Longueur (mm) 3110 Largeur (mm) 2150 Hauteur (mm) …
Prepping for Ebola in Pennsylvania involves orchestra of departments

Prepping for Ebola in Pennsylvania involves orchestra of departments

If you call 911 about a fever and vomiting in Allegheny County, don’t be surprised if the operator asks whether you …
CONTAINERIZED INCINERATOR FOR INCINERATING HAZARDOUS AND NON HAZARDOUS WASTES

CONTAINERIZED INCINERATOR FOR INCINERATING HAZARDOUS AND NON HAZARDOUS WASTES

CONTAINERIZED INCINERATOR FOR INCINERATING HAZARDOUS AND NON HAZARDOUS WASTES (BOTH DOMESTIC AND INDUSTRIAL) AT A MINIMUM RATE OF 300KG/HR WITH THE …
Incinerator for hospital waste management

Incinerator for hospital waste management

Incinerator for hospital waste management with the following features: • In high temperatures (pyrolytic incinerator two chambers with temperatures ranging from …

Sources of Healthcare Waste

Sources of Healthcare Waste •Hospitals •Clinics •Laboratories •Research activities •Nursing homes •Acupuncturist •Paramedic and ambulance services •Animal research •Blood banks • Mortuaries •Autopsy centers Other Sources of Healthcare Wastes •Physicians’ offices •Dental clinics •Chiropractors •Psychiatric hospitals •Cosmetic piercing and tattooing •Institutions for disabled persons •Funeral services …

Containerised Biohazard Incinerator

BIOHAZARD DISPOSAL: CONTAINER GENERAL INCINERATOR, IDEAL FOR INCINERATION OF VARIOUS TYPES OF WASTE, FULLY CONTAINERISED IN A 20 FT CONTAINER, TO …
Waste incineration industry momentum is fierce level of related facilities to be improved

Waste incineration industry momentum is fierce level of related facilities to be improved

Solid Waste Environmental online waste incineration industries development momentum is fierce, and the brightest of capital chasing even appear several …

Incinerator Video

HICLOVER Incinerator YDC model small scale incinerators

INCINERATEUR COMBUSTION DESTRUCTION OF MEDICAL WASTE PYROLYTIC AND LABORATORY,incinerator medical waste manufacturer

Medical Incinerator Installation and Operation Video

clover medcial yz model incinerator video

Incinerator Operation Video

    Recent Posts

    • INCINERATEUR COMBUSTION DESTRUCTION OF MEDICAL WASTE PYROLYTIC AND LABORATORY,incinerator medical waste manufacturer
      Medical Incinerator Installation and Operation Video
    • Small Scale Incinerator Operation Video
      Small Scale Incinerator Operation Video
    • small capacity incinerators
      small capacity incinerators
    • 1 No. in Primary Chamber and 1No. in Secondary Chamber
    • installation of waste disposable incinerator system
    • Opponents of Covanta rail development want more time for public comment
      Opponents of Covanta rail development want more time for public comment
    • Medical Incinerator 30 kg/hr Burn Capacity minimum
    • PYROLYTIC incinerator
    • Incinérateurs
      Incinérateurs
    • Mobile Incinerator Burn Rate 50kg/h minimum
    • CONTAINERIZED INCINERATOR FOR INCINERATING HAZARDOUS AND NON HAZARDOUS WASTES
      CONTAINERIZED INCINERATOR FOR INCINERATING HAZARDOUS AND NON HAZARDOUS WASTES
    • Prepping for Ebola in Pennsylvania involves orchestra of departments
      Prepping for Ebola in Pennsylvania involves orchestra of departments
  • small capacity incinerators
    small capacity incinerators
  • installation of waste disposable incinerator system
  • Opponents of Covanta rail development want more time for public comment
    Opponents of Covanta rail development want more time for public comment
  • Incinérateurs
    Incinérateurs
  • CONTAINERIZED INCINERATOR FOR INCINERATING HAZARDOUS AND NON HAZARDOUS WASTES
    CONTAINERIZED INCINERATOR FOR INCINERATING HAZARDOUS AND NON HAZARDOUS WASTES
  • Prepping for Ebola in Pennsylvania involves orchestra of departments
    Prepping for Ebola in Pennsylvania involves orchestra of departments
  • Incinerator for hospital waste management
    Incinerator for hospital waste management
  • Containerised Biohazard Incinerator
  • Waste incineration industry momentum is fierce level of related facilities to be improved
    Waste incineration industry momentum is fierce level of related facilities to be improved
  • Sources of Healthcare Waste
  • crematorium manufacturers
  • medical incinerator manufacturers
Waste Incinerators Copyright © 2026.
Powered by HICLOVER