eblogs Archive

PYROLYTIC incinerator

This incinerator with “PYROLYTIC” combustion must have:  15. A combustion chamber of waste:  * Perfectly tight door for the manual loading of waste.The loading should be Manual, Batch Load,  * A burner of lighting which the use is limited to the ignition of waste.  * Top Loading loading with door seals gone up on hinges, wheel of screw plug, flexible joint, and stuffing insulating out of refractory.  * The insulation of the combustion chamber should be composed of refractory bricks, having a high content of aluminum and insulates bricks in order to assure a minimum temperature on   the outside sheet metal. * Composition of the refractory; Refractory concrete : . Thickness : ≥100 mm . Nature: 42% of Al203 Insulate in fibrous panels : . Thickness: ≥75 mm Nature: Calcium silicate. * Burner of lighting of waste, with fuel, standard mono-bloc casting guiding plunging flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.  * Plate of combustion in Carborundum, avoiding the fixing of glass and slags. 16. Load Method: Top Loading  17. A chamber of post combustion of gases  * A burner of combustion of gases,  * A device of injection of air allowing a total recombustion of gases,  * A device of air inlet of cooling of waste gases,  * A sheath of evacuation of the gases burnt.  * Carcass in strong sheet steel with support of connection.  * Composition of the refractory; Refractory concrete : Thickness : ≥180 mm Nature: 65% of Al203 Insulate in fibrous panel : Thickness: ≥85 mm  Nature: Calcium * Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.  * A secondary injection of air to ensure perfect oxygen content.  18. A control box ensuring the complete cycle of combustion.  19. Fan:  * Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and following the control of the automatic cycle.  20. Controls and regulations:  Control box water tight to dust, including:  * A switch circuit breaker for each engine (ventilators and burners).  * A timer with adjustable temporization for the regulation of each burner.  * A regulator with digital watching for the temperature of combustion.  * A regulator with digital watching for the temperature of postcombustion.  …

hiclover.com macau pet cremation incinerator

Presently, we supply different series for local customer requirements and design  updated incinerator with our leading technology. The updated design feature  of our range of incinerators make them one of the most cost effective in the world. Key Features: * All models with Dual combustion chamber.  * Stainless Steel chimney/stack, long lifetime.  * High temperature, long lifetime of incinerator. * Free or minimum installation on site. * High burn rate, from 10kgs to 600kgs per hour, up to 10ton per day. * PLC Control Plane for Intelligent operation.  * New Design for pet animal cremation business. * One year warranty on incinerator and parts in stock. It features unique and advanced merits with compact size, high burning effect,  reasonable burning technology, high degree of non-harm etc.It is an ideal  choice for waste treatment of hospitals, hotels and various areas. Features: (1)   Gasifiedpyrolysis incineration is used for burning many kinds of waste.(2)   Waste can be burned once everyday by gasified incineration.(3)   Gasified incineration, mixed incineration and burnout treatment ensures low emission standard of dust,dioxin etc.(4)   Totally enclosed operation is suitable for treating infectious waste to avoid secondary pollution. (5)   Compact structure and small land occupation. WWW.HICLOVER.COM|Waste Incinerators |Auto Roll Air Filters Nanjing Clover Medical Technology Co.,Ltd. Tel:  +86-25-8461 0201    Mobile: +86-13813931455(whatsapp/wechat)Website: www.hiclover.com  Email: [email protected][email protected]   Items/Model TS10(PLC) TS20(PLC) TS30(PLC) TS50(PLC) TS100(PLC) Burn Rate (Average) 10 kg/hour 20 kg/hour 30 …

Hazardous Waste to be Incinerated

Hazardous solid chemical: Different types of combustible solids, used textiles, grease, and toner cartridges, chemicalsfor water purification and photographic consumables and plastic material, emptyplastic/metal cans that still contain remnant hazardous material, oil absorbent. Hazardous liquid chemical:Mainly different types. of Acid, Paint, Varnish, Acetone, White Spirit Aromatic-lessSolvents, Synthetic Liquid for Break Systems, Aircraft De-icing Liquid, Hydraulic andCompressor oil, Freon, used in some older refrigeration units, Insecticide liquid/spray, airrefresh spray and other similar chemicals. Contaminated fuel:Mainly diesel or gasoline contaminated by water or solvents. Used and/or Contaminated oil: Used motor oils and/or mineral oils unfit for their originally intended use. Mainly motorand gearbox oil (approximately 80%) contaminated by a mixture of white spirit and acetone (approximately 51%), hydraulic liquid (approximately 5%). Contaminated water: Waste oilshvater, leaches, hydrocarbons/water mixtures, emulsions and leachate. Contaminated soil: Soil polluted by oil, fuel or 11 chemicals.Contaminated soil polluted by chemicals that has to be recycled in landfill.Contaminated soil—treated and replaced on site. Oil Contaminated SolidsRags, Absorbents, Cardboard, oil and fuel filters, air filters are not consider as hazardous materials. Electronic waste: Waste electrical or electronic appliances or assemblies, including printed circuit boards,containing toxic material and/or heavy metal and/or emitting low radiation. Used battery cells: Dry battery, UPS battery or other types, unsorted waste batteries/ battery cells, containingmaterials that are hazardouy. Used lead-acid batteries:Waste lead-acid batteries, rained/un-drained, and whole or crushed. Hazardous medical waste: Clinical and related waste, arising from medical, nursing or similar practices and wastegenerated in clinics during the investigation or treatment of patients (bio hazard). Expired drugs, solid: Waste pharmaceuticals, drugs and medicines, including sensitive medicines.Expired drugs Iiquid: Waste liquid pharmaceuticals, different type liquid chemicals for treatment, medicalgrease, and paraffin based xpired medicines. Expired and/or contaminated fod: Spoiled fresh food or unusable MRE’s (Meal Ready for Eat – dry food) Onsite Training and Assem Option for Industrial Incinerators I. The bidders should includ 1a price in their offer for training in a central location ( Goma orBukavu) approximately 15 staff in the operation and maintenance of theequipment. Smart Ash Incinerators 1. Size requirement for the incinerators is that the unit works with a 55 gallon open endedsteel drum.2. The unit should operate wit. no fuel and use only 120V or 220V electricity for the blowers.3. The unit should be capable of burning oil contaminated wastes and medical wastes with a moisture content of 0-15%J4. Each unit should come witH two steel drums, so that a spare drum is available. Spare Parts OptionIf there are any vendor suggested spare parts , that list and price should be included as an option in the offer.

a modern waste disposal unit, designed to bum medical waste in a clean and environmentally efficient manner

The incinerator should be a modern waste disposal unit, designed to bum medical waste in a clean and environmentally efficient manner. It  should employ a temperature based logic control system to provide optimum control of the operating conditions and incorporate a high capacity  thermal oxidizing secondary chamber. It should be designed to retain the exhaust gases, for at least 2 seconds to ensure the unit’s effective  destruction of the combustion products.   i. Waste type Health care waste   ii. Waste density 125 to 350Kg/M3   iii.. Waste Calorific Value 4000 KCAL/Kg   iv. Moisture content 10-25%   v.  Estimated ash  residue 5-10%   vi.  Nominal capacity  50Kg/hour batch load   vii.  Secondary chamber 2 seconds @ 850°C   The primary combustion chamber is the main structure of the incinerator, fabricated from mild steel plate and stiffened with rolled steel  sections. It is carried from the floor level on a substantial steel support frame. Internally the shell is lined with calcium silicate  insulation and a hot face combination of super duty brickwork or high strength castable.   The primary combustion chamber must ensure minimum exit temperature is not less than 850°C.   One Manual Load Incinerator comprising:   •         Manual Loading door …

INCINERATOR QUESTIONNAIRE

1. Type of waste: Trash   2. Any other type: 3. Quantity of waste generated per day in kg: (50 Ton per day) SOW 4. Duration – incinerator will be used per day: (Minimum 12 hours) SOW 5. Approximate moisture content:  6. Local incinerator operating and emission standards: US-EPA  7. What is the height of the chimney required: Not known 8. Fuel proposed to be used: Deiseal Oil  9. Availability of power and type: 220 or 110  10. Details of space available: Plenty of space  11. Do you require an automatic loading system:  Yes   No  12. Do you require a gas scrubbing system:  Yes   No  13. How soon do you require the system to be delivered: 30  14. Any other specific requirements: 15. Nature: (Solid/Semi-solid/Liquid) Burning Capacity: 125 kg minimum/time (3-6times/day), double chamber, double combustion system Imputing door Mouth Width (mm): 760*760 (approx.) Chimney External Diameter (mm): 300 ± 10 Combustion Improver Device: 0.11kw, Fuel consumption: 7kg/ hour (max) Re-Burning Device: Oil consumption: 5kg/h, 0.37kw, Oil consumption: 10-20kg/h Voltage: 380v/220v AC, Warranty: 1 Year, 50 Hz 

3 Chamber Incinerator

Primary chamber:Heavy duty mild steel casing, High quality Refractory lining and insulation 01 x natural gas ignition burners (automatic)  01 x temperature sensor points with complete internal fans.Secondary Chamber:Heavy duty mild steel casing, high quality refractory lining and insulation 01 x natural gas burners (automatic) with complete 01 internal fans. 02 Sec gas residence times.Third Chamber:Heavy duty mild steel casing, high quality refractory lining and insulation 01 x natural gas ignition burners (automatic) with complete internal fans. 02 Sec gas residence time.Integrated dual flu gas washer: Resultant gasses passed through dual gas filtration system for maximum clean emission. It is also equipped with chain filters.Chimney:Heavy duty 5mm or more stainless steel casing mild steel casing.Stack cap/spark arrestors.Control Panel:a.Temperature Monitoring with 4 digit display.b.Thermostat control device for burner (fuel saver)c.Temperature control 0-12 hours.d.Integral fan timer control

incinerator technical request

Cyclone separator Electrostatic precipitators Fabric filters 6 Chimney / Stack 1. The chimney should have a minimum height of 10 meters above ground level and clear the highest point of the building by not less than 3 meters for all roofs. The topography and height of adjacent buildings within 50 meters radius should be taken into account. 2. If possible the chimney should be visible to the operator from the feeding area. 3. The addition of dilution air after combustion in order to achieve the requirement of these guidelines is unacceptable. 4. The minimum exit velocity should be 10 m/s and at least twice the surrounding wind speed (Efflux velocity = wind speed  x 2) whichever is higher to ensure no down washing of exiting gases. 5. Point for the measurement of emissions shall be provided. 7 Instrumentation Instrument for determining the inside wall temperature and not burner flame temperature must be provided for both primary and secondary chambers. 2. An audible and visible alarm must be installed to warn the operator when the secondary temperature drops to below the  required temperature. 3. In addition to the above the following instruments may also be required. A carbon monoxide and/or oxygen meter/recorder A smoke density meter/recorder A gas flow meter/recorder A solid particulate meter/recorder Any other instrument or measurement that may be considered necessary 8 Emission Limits 1. Combustion efficiency: Combustion efficiency (CE) shall be at least 99.00% The Combustion efficiency is computed as follows; C.E= % CO 2 x 100 % CO2 + CO 2. The temperature of the primary chamber shall be 800 ± 50o C 3. …

3 Chamber Incinerator

Primary chamber:Heavy duty mild steel casing, High quality Refractory lining and insulation 01 x natural gas ignition burners (automatic)  01 x temperature sensor points with complete internal fans.Secondary Chamber:Heavy duty mild steel casing, high quality refractory lining and insulation 01 x natural gas burners (automatic) with complete 01 internal fans. 02 Sec gas residence times.Third Chamber:Heavy duty mild steel casing, high quality refractory lining and insulation 01 x natural gas ignition burners (automatic) with complete internal fans. 02 Sec gas residence time.Integrated dual flu gas washer: Resultant gasses passed through dual gas filtration system for maximum clean emission. It is also equipped with chain filters.Chimney:Heavy duty 5mm or more stainless steel casing mild steel casing.Stack cap/spark arrestors.Control Panel:a.Temperature Monitoring with 4 digit display.b.Thermostat control device for burner (fuel saver)c.Temperature control 0-12 hours.d.Integral fan timer control

Incinerator Spare part list

Spare part list – Ignition burner                          Item description                   N0 of required                             Motor                                       2                          Control box                              2                           Pump couplings                       4                          Photo cells                               2                          Sets ht. leads                           2                          Sets electrodes                         4                          Oil valve                                   1                          Nozzle                                       2                                                             Spare part list – After burners                          Item description                   N0 of required                             Motor                                       2                          Control box                              2                           Pump couplings                       4                          Photo cells                               2                          Sets ht. leads                           2                          Sets electrodes                         4                          Oil valve                                   1                          Nozzle                                       2 Spare part list – Ram loader                           Item description                   N0 of required                         Reed switch                               4                        Seal kit                                       1      Medical waste incinerator Accessories  – Clean out tools – Loading and ash removal methods.      – Fuel storage tank with the two pump and all accessories.  – Flue gas cleaning system – Stack discharge. –      Medical waste incinerator civil work – Construct incinerator foundation     – Provide stack support     – Provide open steel structure room for the incinerator.     Medical waste incinerator submittal shall include:- -Detail installation drawing – Incinerator and auxiliary product data      – Test reports      – Certificates like CE, ISO, LR, AFNOR, TUV and UL.      – Energy analysis report …

1 No. in Primary Chamber and 1No. in Secondary Chamber

No. of burners: 2 Nos. (1 No. in Primary Chamber and 1No. in Secondary Chamber)Type: Monoblock fully automaticFuel: DieselFuel Oil Storage Tank:Shall provide suitable capacity of oil storage tank.Material of Construction: Mild steel.Facility for visual checking of fuel shall be there.It shall have diesel consumption monitoring system.It shall come with diesel oil level indicator, piping with valves & N.R. valve.Control Panel:Type: Manual & Automated PLC based control panel with printer & recording device.Material of Construction: CRCA sheetIt shall have digital temperature controller.Epoxy powder coated washable paint finish.It shall have audio-visual alarm system.Chimney of 30 meters Height:Material of Construction: Mild SteelIt shall be self-supporting type.Height shall be 30 meters from ground level.Paint The chimney is painted externally with two coats of heat resistant aluminum paintShall provide ladder till the top.It shall have 3mm thick rubber lining from inside for protection.It shall come with aviation lamp, lightening arrestor, stack, drain, inspection platform, samplingport.Consumption certificate:The bidder must submit diesel consumption for a daily operation of 6 hours.Turnkey:Prices offered shall be inclusive of all civil works, electrical requirements including cabling andswitches required for installation & commissioning of the equipment.Bidder shall submit detail drawings, design, and layout plan of civil works.The bidder shall submit the details of BOQ of civil and electrical works.Accessories, spares and consumablesAll standard accessories, consumables and parts required to operate the equipment, includingall standard tools and cleaning and lubrication materials, to be included in the offer. Biddersmust specify the quantity of every item included in their offer (including items not specifiedabove).Operating EnvironmentThe system offered shall be designed to store and to operate normally under the conditions ofthe purchaser’s country. The conditions include Power Supply, Climate, Temperature,Humidity, etc.Power supply: 220-240 VAC, 50Hz single phase/400 C 420 VAC, 50Hz three phase asappropriate fitted with appropriate plug. The power cable must be at least 3 meter in length.Standards and Safety RequirementsIt shall have approval of “Pollution Control Board” of purchaser’s country.All mandatory approvals required for the installation and operation of incinerator shall be doneby the bidder.Must submit ISO 9001 ANDCE or USFDA approved product certificate.User TrainingMust provide user training (including how to use and maintain the equipment).WarrantyComprehensive warranty for 2 years after acceptance.Maintenance Service during Warranty PeriodDuring the warranty period supplier must ensure preventive maintenance along withcorrective/breakdown maintenance whenever required.Installation and CommissioningThe bidder must arrange for the equipment to be installed and commissioned by certified orqualified personnel; any prerequisites for installation to be communicated to the purchaser inadvance, in detail.

Hazardous Waste to be Incinerated

Hazardous solid chemical: Different types of combustible solids, used textiles, grease, and toner cartridges, chemicalsfor water purification and photographic consumables and plastic material, emptyplastic/metal cans that still contain remnant hazardous material, oil absorbent. Hazardous liquid chemical:Mainly different types. of Acid, Paint, Varnish, Acetone, White Spirit Aromatic-lessSolvents, Synthetic Liquid for Break Systems, Aircraft De-icing Liquid, Hydraulic andCompressor oil, Freon, used in some older refrigeration units, Insecticide liquid/spray, airrefresh spray and other similar chemicals. Contaminated fuel:Mainly diesel or gasoline contaminated by water or solvents. Used and/or Contaminated oil: Used motor oils and/or mineral oils unfit for their originally intended use. Mainly motorand gearbox oil (approximately 80%) contaminated by a mixture of white spirit and acetone (approximately 51%), hydraulic liquid (approximately 5%). Contaminated water: Waste oilshvater, leaches, hydrocarbons/water mixtures, emulsions and leachate. Contaminated soil: Soil polluted by oil, fuel or 11 chemicals.Contaminated soil polluted by chemicals that has to be recycled in landfill.Contaminated soil—treated and replaced on site. Oil Contaminated SolidsRags, Absorbents, Cardboard, oil and fuel filters, air filters are not consider as hazardous materials. Electronic waste: Waste electrical or electronic appliances or assemblies, including printed circuit boards,containing toxic material and/or heavy metal and/or emitting low radiation. Used battery cells: Dry battery, UPS battery or other types, unsorted waste batteries/ battery cells, containingmaterials that are hazardouy. Used lead-acid batteries:Waste lead-acid batteries, rained/un-drained, and whole or crushed. Hazardous medical waste: Clinical and related waste, arising from medical, nursing or similar practices and wastegenerated in clinics during the investigation or treatment of patients (bio hazard). Expired drugs, solid: Waste pharmaceuticals, drugs and medicines, including sensitive medicines.Expired drugs Iiquid: Waste liquid pharmaceuticals, different type liquid chemicals for treatment, medicalgrease, and paraffin based xpired medicines. Expired and/or contaminated fod: Spoiled fresh food or unusable MRE’s (Meal Ready for Eat – dry food) Onsite Training and Assem Option for Industrial Incinerators I. The bidders should includ 1a price in their offer for training in a central location ( Goma orBukavu) approximately 15 staff in the operation and maintenance of theequipment. Smart Ash Incinerators 1. Size requirement for the incinerators is that the unit works with a 55 gallon open endedsteel drum.2. The unit should operate wit. no fuel and use only 120V or 220V electricity for the blowers.3. The unit should be capable of burning oil contaminated wastes and medical wastes with a moisture content of 0-15%J4. Each unit should come witH two steel drums, so that a spare drum is available. Spare Parts OptionIf there are any vendor suggested spare parts , that list and price should be included as an option in the offer.

Hazardous Waste to be Incinerated

Hazardous solid chemical: Different types of combustible solids, used textiles, grease, and toner cartridges, chemicalsfor water purification and photographic consumables and plastic material, emptyplastic/metal cans that still contain remnant hazardous material, oil absorbent. Hazardous liquid chemical:Mainly different types. of Acid, Paint, Varnish, Acetone, White Spirit Aromatic-lessSolvents, Synthetic Liquid for Break Systems, Aircraft De-icing Liquid, Hydraulic andCompressor oil, Freon, used in some older refrigeration units, Insecticide liquid/spray, airrefresh spray and other similar chemicals. Contaminated fuel:Mainly diesel or gasoline contaminated by water or solvents. Used and/or Contaminated oil: Used motor oils and/or mineral oils unfit for their originally intended use. Mainly motorand gearbox oil (approximately 80%) contaminated by a mixture of white spirit and acetone (approximately 51%), hydraulic liquid (approximately 5%). Contaminated water: Waste oilshvater, leaches, hydrocarbons/water mixtures, emulsions and leachate. Contaminated soil: Soil polluted by oil, fuel or 11 chemicals.Contaminated soil polluted by chemicals that has to be recycled in landfill.Contaminated soil—treated and replaced on site. Oil Contaminated SolidsRags, Absorbents, Cardboard, oil and fuel filters, air filters are not consider as hazardous materials. Electronic waste: Waste electrical or electronic appliances or assemblies, including printed circuit boards,containing toxic material and/or heavy metal and/or emitting low radiation. Used battery cells: Dry battery, UPS battery or other types, unsorted waste batteries/ battery cells, containingmaterials that are hazardouy. Used lead-acid batteries:Waste lead-acid batteries, rained/un-drained, and whole or crushed. Hazardous medical waste: Clinical and related waste, arising from medical, nursing or similar practices and wastegenerated in clinics during the investigation or treatment of patients (bio hazard). Expired drugs, solid: Waste pharmaceuticals, drugs and medicines, including sensitive medicines.Expired drugs Iiquid: Waste liquid pharmaceuticals, different type liquid chemicals for treatment, medicalgrease, and paraffin based xpired medicines. Expired and/or contaminated fod: Spoiled fresh food or unusable MRE’s (Meal Ready for Eat – dry food) Onsite Training and Assem Option for Industrial Incinerators I. The bidders should includ 1a price in their offer for training in a central location ( Goma orBukavu) approximately 15 staff in the operation and maintenance of theequipment. Smart Ash Incinerators 1. Size requirement for the incinerators is that the unit works with a 55 gallon open endedsteel drum.2. The unit should operate wit. no fuel and use only 120V or 220V electricity for the blowers.3. The unit should be capable of burning oil contaminated wastes and medical wastes with a moisture content of 0-15%J4. Each unit should come witH two steel drums, so that a spare drum is available. Spare Parts OptionIf there are any vendor suggested spare parts , that list and price should be included as an option in the offer.

Technical specification for burning incinerator machine

17.The primary burning room  should have at least 2 burners. 18.The secondary burning room should have one burner. 19.  Each system should have doors for ash, exit for air to the chimney and windows to allow looking inside and for maintenance. 20.Each system should have filtering system for gas processing with 2 tanks using ordinary water. Each water tank should have capacity of 1000  lt and should be fixed to the system and provided with water level indicator. 21.Each system should have special technology for separating waist products and humidity after gas processing. 22.Each system should have cooling capability after operation. 23.Each system m should be provided with exhaust pipe with 250 mm diameter and 10 m high. The base of the exhaust system should be 1000 mm.  The exhaust pipe should be 6 mm and should be provide with heat insulator.  The exhaust system should be provided with pressure indicator. It  should also provide with ladder and Lightning Arrestor. 24.Electric power: should be 220 volt, 3 phase, 60 Hz, and the motor should not be less than 15 HP. 25.Each system should be provided with control panel and indicators and needed safety equipment and alarm systems. The control panel should  show at least temperature in both the primary and secondary rooms and injectors of the filters and load.    26.Each system should be provided with alarm system for any breakdown or defect of any component of the system. 27.The following personal protective tools must be provide: a.Heat resistant garments for 20 persons. b.Heat resistant goggles for 20 persons. 28.All components of each system should be painted with silver color that is heat resistant.

station and house for incinerator

the local site have to supply incinerator station and house for incinerator. and if you choose gas type incinerator, you have to contact local gas supply department/company to do the gas supply work. the installation work can not finish only by our engineers, local site have to supply local engineers or worker and also equipment. generally, the installation can be finish within 02 days. as our experience, local engineers can installation themself. we proposal you arrange local engineers to do this work.  was finalizing the technical features and specifications of the Unit of the Medical Wastes Incinerator I needed. Finally I opted for the Medical Wastes Incinerator with a Burn Rate Capacity of 150 Kg/ hour and equipped with one Incinerator Smoke Dust Filter (Wet Scrubber). Furthermore, I’d like to get some other informations: – 1) Can you equip the Incinerator with an automatic feed mode ? if yes, please do add it to the order. -1) The Incinerator Smoke Dust Filter can work in Dry Process ? If yes, I prefer the Dry Process. – effectiveness for the treatment of placenta? and expired or spoiled drugs, cytotoxic and cytostatic drugs prescribed: narcotics eg – Does it allow to treat drug or waste containing glass (whatever color: transparent or colored white) without causing explosions? – The ability of the liquid waste treatment (blood, urine stained, other body fluids contaminated, regardless what volume packaging? – The efficiency of process chemicals (after neutralization and detoxification: solids and liquids) – Is there  microbiological testing especially: the processing efficiency bascillus – Manual technical monitoring is shipped with the hardware with all explanations of failures and resolutions

station and house for incinerator

the local site have to supply incinerator station and house for incinerator. and if you choose gas type incinerator, you have to contact local gas supply department/company to do the gas supply work. the installation work can not finish only by our engineers, local site have to supply local engineers or worker and also equipment. generally, the installation can be finish within 02 days. as our experience, local engineers can installation themself. we proposal you arrange local engineers to do this work.  was finalizing the technical features and specifications of the Unit of the Medical Wastes Incinerator I needed. Finally I opted for the Medical Wastes Incinerator with a Burn Rate Capacity of 150 Kg/ hour and equipped with one Incinerator Smoke Dust Filter (Wet Scrubber). Furthermore, I’d like to get some other informations: – 1) Can you equip the Incinerator with an automatic feed mode ? if yes, please do add it to the order. -1) The Incinerator Smoke Dust Filter can work in Dry Process ? If yes, I prefer the Dry Process. – effectiveness for the treatment of placenta? and expired or spoiled drugs, cytotoxic and cytostatic drugs prescribed: narcotics eg – Does it allow to treat drug or waste containing glass (whatever color: transparent or colored white) without causing explosions? – The ability of the liquid waste treatment (blood, urine stained, other body fluids contaminated, regardless what volume packaging? – The efficiency of process chemicals (after neutralization and detoxification: solids and liquids) – Is there  microbiological testing especially: the processing efficiency bascillus – Manual technical monitoring is shipped with the hardware with all explanations of failures and resolutions

a modern waste disposal unit, designed to bum medical waste in a clean and environmentally efficient manner

The incinerator should be a modern waste disposal unit, designed to bum medical waste in a clean and environmentally efficient manner. It  should employ a temperature based logic control system to provide optimum control of the operating conditions and incorporate a high capacity  thermal oxidizing secondary chamber. It should be designed to retain the exhaust gases, for at least 2 seconds to ensure the unit’s effective  destruction of the combustion products.   i. Waste type Health care waste   ii. Waste density 125 to 350Kg/M3   iii.. Waste Calorific Value 4000 KCAL/Kg   iv. Moisture content 10-25%   v.  Estimated ash  residue 5-10%   vi.  Nominal capacity  50Kg/hour batch load   vii.  Secondary chamber 2 seconds @ 850°C   The primary combustion chamber is the main structure of the incinerator, fabricated from mild steel plate and stiffened with rolled steel  sections. It is carried from the floor level on a substantial steel support frame. Internally the shell is lined with calcium silicate  insulation and a hot face combination of super duty brickwork or high strength castable.   The primary combustion chamber must ensure minimum exit temperature is not less than 850°C.   One Manual Load Incinerator comprising:   •         Manual Loading door …

1 No. in Primary Chamber and 1No. in Secondary Chamber

No. of burners: 2 Nos. (1 No. in Primary Chamber and 1No. in Secondary Chamber)Type: Monoblock fully automaticFuel: DieselFuel Oil Storage Tank:Shall provide suitable capacity of oil storage tank.Material of Construction: Mild steel.Facility for visual checking of fuel shall be there.It shall have diesel consumption monitoring system.It shall come with diesel oil level indicator, piping with valves & N.R. valve.Control Panel:Type: Manual & Automated PLC based control panel with printer & recording device.Material of Construction: CRCA sheetIt shall have digital temperature controller.Epoxy powder coated washable paint finish.It shall have audio-visual alarm system.Chimney of 30 meters Height:Material of Construction: Mild SteelIt shall be self-supporting type.Height shall be 30 meters from ground level.Paint The chimney is painted externally with two coats of heat resistant aluminum paintShall provide ladder till the top.It shall have 3mm thick rubber lining from inside for protection.It shall come with aviation lamp, lightening arrestor, stack, drain, inspection platform, samplingport.Consumption certificate:The bidder must submit diesel consumption for a daily operation of 6 hours.Turnkey:Prices offered shall be inclusive of all civil works, electrical requirements including cabling andswitches required for installation & commissioning of the equipment.Bidder shall submit detail drawings, design, and layout plan of civil works.The bidder shall submit the details of BOQ of civil and electrical works.Accessories, spares and consumablesAll standard accessories, consumables and parts required to operate the equipment, includingall standard tools and cleaning and lubrication materials, to be included in the offer. Biddersmust specify the quantity of every item included in their offer (including items not specifiedabove).Operating EnvironmentThe system offered shall be designed to store and to operate normally under the conditions ofthe purchaser’s country. The conditions include Power Supply, Climate, Temperature,Humidity, etc.Power supply: 220-240 VAC, 50Hz single phase/400 C 420 VAC, 50Hz three phase asappropriate fitted with appropriate plug. The power cable must be at least 3 meter in length.Standards and Safety RequirementsIt shall have approval of “Pollution Control Board” of purchaser’s country.All mandatory approvals required for the installation and operation of incinerator shall be doneby the bidder.Must submit ISO 9001 ANDCE or USFDA approved product certificate.User TrainingMust provide user training (including how to use and maintain the equipment).WarrantyComprehensive warranty for 2 years after acceptance.Maintenance Service during Warranty PeriodDuring the warranty period supplier must ensure preventive maintenance along withcorrective/breakdown maintenance whenever required.Installation and CommissioningThe bidder must arrange for the equipment to be installed and commissioned by certified orqualified personnel; any prerequisites for installation to be communicated to the purchaser inadvance, in detail.